Belchertown Solar PV + Battery Project
Solar + storage
Key facts
Solar + storage Under construction (source status: (U) Under construction, less than or equal to 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Interconnection queue
- ISO-NE
- In-service date
- (stated)
- Location
- Hampshire County, Massachusetts
Details
Who’s behind it
- Developer
- Agilitas Energy, Inc.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Technology
- Solar + storage source: “Solar Photovoltaic + Batteries”
- Capacity (MW)
- 5.6 Capacity is the sum of the 2 generators listed under Sources.
- EIA plant
- 70538 2 generatorsEIA generatorsPlant 70538 BRH, BRHBA
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as under construction in EIA-860M (source status: “(U) Under construction, less than or equal to 50 percent complete”).
- First published from EIA-860M Preliminary Monthly Electric Generator Inventory.
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Stony Brook Postponed | Gas, combined cycle | 10.1 mi | 422 |
| Riverside Holyoke Postponed | Hydro | 13.4 mi | 1.1 |
| Hadley Falls Postponed | Hydro | 13.4 mi | 3.5 |
| Palmer Renewable Energy Postponed | Biomass | 13.8 mi | 42 |
Sources EIA-860M