Stony Brook
Gas, combined cycle
Key facts
Gas, combined cycle Postponed (source status: Canceled or Postponed) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Interconnection queue
- ISO-NE
- Location
- Hampden County, Massachusetts
Details
Who’s behind it
- Developer
- Massachusetts Mun Wholes Electric Co
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
- Capacity (MW)
- 422 Capacity is the sum of the 2 generators listed under Sources.
- EIA plant
- 6081 2 generatorsEIA generatorsPlant 6081 3A, CT4
Timeline
- Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Palmer Renewable Energy Postponed | Biomass | 3.8 mi | 42 |
| Riverside Holyoke Postponed | Hydro | 4.3 mi | 1.1 |
| Hadley Falls Postponed | Hydro | 4.9 mi | 3.5 |
| Chicopee BESS Under construction | Storage | 5.4 mi | 5 |
| Holyoke MA BESS 1 Under construction | Storage | 7.4 mi | 5 |
| Belchertown Solar PV + Battery Project Under construction | Solar + storage | 10.1 mi | 5.6 |
Sources EIA-860M