Show on map
- Wind & solar
- Under construction
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Under construction
Bigler - PA 0438 (Flango 4): the source's site coordinate and 4 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Bigler - PA 0438 (Flango 4)
Solar
Key facts
Solar Under construction (source status: (U) Under construction, less than or equal to 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- In-service date
- (stated)
- Location
- Clearfield County, Pennsylvania
Details
Who’s behind it
- Developer
- CVE US PA Bigler 438 LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “Solar Photovoltaic”
- EIA plant
- 70078 generator 438
At this site
4 records at Bigler - PA 0409 (Flango 1)At this siteGrouped by the same exact location and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Bigler - PA 0409 (Flango 1) | Solar | 3 | Under construction |
| Another phase high confidence | Bigler - PA 0437 (Flango 3) | Solar | 3 | Under construction |
| Another phase high confidence | Bigler - PA 0436 (Flango 2) | Solar | 3 | Under construction |
| Another phase high confidence | Bigler - PA 0438 (Flango 4) this record | Solar | 2 | Under construction |
Sources EIA-860M
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as under construction in EIA-860M (source status: “(U) Under construction, less than or equal to 50 percent complete”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Bigler - PA 0437 (Flango 3) Under construction | Solar | 0.0 mi | 3 |
| Bigler - PA 0409 (Flango 1) Under construction | Solar | 0.0 mi | 3 |
| Bigler - PA 0436 (Flango 2) Under construction | Solar | 0.0 mi | 3 |
| Seldom Seen Wind LLC Postponed | Wind | 14.6 mi | 41 |
Sources EIA-860M