Show on map
Blair Hill Wind FarmChalloch Barnkirk Road Battery Storage & solar farm -- — Announced · Solar · 20 MW · 5.1 km awayCorwar wind farm -- — Wind · 16.4 MW · 14.9 km awayKilgallioch Windfarm solar fram -- — Canceled · Solar · 20 MW · 16.2 km awayCalifornia wind farm -- — Wind · 21 MW · 19.4 km awayChirmorie Wind Farm — Permitted · Wind · 91 MW · 20.3 km awayClauchrie Windfarm — Filed · Wind + storage · 108 MW · 20.6 km awayTorrs Hill wind farm -- — Under construction · Wind · 4 MW · 20.7 km awayGarvilland Farm wind farm -- — Announced · Wind · 18 MW · 22.1 km awayBARLOCKHART MOOR wind farm -- — Wind · 8.2 MW · 23.5 km awayLongburn I wind farm -- — Wind · 23 MW · 24.2 km awayBarlockhart Moor Wind Turbines -- — Announced · Wind · 8.4 MW · 24.7 km away
  • Wind & solar
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Blair Hill Wind Farm

Wind

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Queue position
PRO-004994
In-service date
(stated)
Location
Scotland, United Kingdom

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Wind source: “Wind Onshore”
Capacity (MW)
99 Capacity is the interconnection request in NESO Transmission Entry Capacity (TEC) Register. The 1 generator listed in Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) (listed under Sources) total 145 MW nameplate.
Connects at
BLAIR HILL WIND FARM 132KV SUBSTATIONConnection point99 MW active (1 of 1 projects).

Timeline

  • Stated In-service date stated by NESO.
  • Observed as filed in NESO (source status: “Scoping”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources GEM · NESO

Supported by National Energy SO Open Data

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • NESOOpen license, with credit · retrieved Nov 13, 2026Supported by National Energy SO Open Data

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Challoch Barnkirk Road Battery Storage & solar farm -- Announced Solar 5.1 km 20
Corwar wind farm -- Unknown Wind 14.9 km 16.4
Kilgallioch Windfarm solar fram -- Canceled Solar 16.2 km 20
California wind farm -- Unknown Wind 19.4 km 21
Chirmorie Wind Farm Permitted Wind 20.3 km 91
Clauchrie Windfarm Filed Wind + storage 20.6 km 108
Torrs Hill wind farm -- Under construction Wind 20.7 km 4
Garvilland Farm wind farm -- Announced Wind 22.1 km 18
BARLOCKHART MOOR wind farm -- Unknown Wind 23.5 km 8.2
Longburn I wind farm -- Unknown Wind 24.2 km 23
Barlockhart Moor Wind Turbines -- Announced Wind 24.7 km 8.4

Sources GEM · NESO

Supported by National Energy SO Open Data

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • NESOOpen license, with credit · retrieved Nov 13, 2026Supported by National Energy SO Open Data

Attribution