Brightside Solar Alt POI

overdue by 3 months (target Aug 14, 2026)

Solar

Capacity
Capacity: sourceERCOT · Open licenseMW
In-service date
(stated)
Location
Live Oak County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Solar source: “Solar - Photovoltaic Solar”
Connects at
8156 Charter 138 kVConnection point180.6 MW active (2 of 2 projects).

Timeline

  • Observed as contracted in ERCOT (source status: “Completed”).
  • Stated In-service date stated by ERCOT. Passed 3 months ago; ERCOT still says contracted.
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Overdue: the stated date is more than 90 days past. Some sources stop updating dates once a project is built.