Show on map
Bruce nuclear power plant C2Bruce nuclear power plant C1 — Announced · Nuclear · 1,000 MW · 0.0 km awayBruce nuclear power plant C3 — Announced · Nuclear · 1,000 MW · 0.0 km awayBruce nuclear power plant C4 — Announced · Nuclear · 1,000 MW · 0.0 km away
  • Clean firm
  • In development
  • 10 · 100 · 1,000 MW

Bruce nuclear power plant C2

Nuclear

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Ontario, Canada

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Nuclear source: “nuclear / unknown”

At this site

4 records at Bruce nuclear power plant C1At this siteGrouped by the same exact location and project name. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Bruce nuclear power plant C1 Nuclear 1,000 Announced
Same site, relation unclear low confidence Bruce nuclear power plant C2 this record Nuclear 1,000 Announced
Same site, relation unclear low confidence Bruce nuclear power plant C3 Nuclear 1,000 Announced
Same site, relation unclear low confidence Bruce nuclear power plant C4 Nuclear 1,000 Announced

Sources GEM

Sources

  • GEMTerms of use · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution

Timeline

  • Observed as announced in GEM (source status: “announced”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Bruce nuclear power plant C1 Announced Nuclear 0.0 km 1,000
Bruce nuclear power plant C3 Announced Nuclear 0.0 km 1,000
Bruce nuclear power plant C4 Announced Nuclear 0.0 km 1,000

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution