Show on map
Bryn Posteg Landfill Site Solar Array & Battery Storage --Hirddywel wind farm -- — Announced · Wind · 27 MW · 4.9 km awayHirddywell (Celtpower Ltd.) wind farm -- — Canceled · Wind · 14.8 MW · 6.2 km awayLlandinam wind farm RP1 — Announced · Wind · 102 MW · 6.9 km awayFferm Wynt Llaithddu Cyf wind farm -- — Canceled · Wind · 66.7 MW · 7.8 km awayGarn Fach Wind Farm — Filed · Wind + storage · 162 MW · 8.7 km awayWaun Garno wind farm -- — Canceled · Wind · 16.5 MW · 11.1 km awayNeuadd Goch Bank wind farm -- — Canceled · Wind · 27 MW · 12.1 km awayLlanbadarn Fynydd wind farm -- — Canceled · Wind · 51 MW · 12.8 km awayCarno wind farm 3 — Announced · Wind · 45 MW · 15.0 km awayBryngydfa wind farm -- — Announced · Wind · 36 MW · 16.8 km awayMynydd Clogau wind farm 1 — Canceled · Wind · 16 MW · 17.8 km awayCemmaes 3 wind farm -- — Canceled · Wind · 24 MW · 18.4 km awayEsgair Cwmowen wind farm -- — Announced · Wind · 47.5 MW · 23.4 km away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Bryn Posteg Landfill Site Solar Array & Battery Storage --

Solar

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Wales, United Kingdom

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “utility-scale solar / PV”

Timeline

  • Observed as canceled in GEM (source status: “cancelled”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Hirddywel wind farm -- Announced Wind 4.9 km 27
Hirddywell (Celtpower Ltd.) wind farm -- Canceled Wind 6.2 km 14.8
Llandinam wind farm RP1 Announced Wind 6.9 km 102
Fferm Wynt Llaithddu Cyf wind farm -- Canceled Wind 7.8 km 66.7
Garn Fach Wind Farm Filed Wind + storage 8.7 km 162
Waun Garno wind farm -- Canceled Wind 11.1 km 16.5
Neuadd Goch Bank wind farm -- Canceled Wind 12.1 km 27
Llanbadarn Fynydd wind farm -- Canceled Wind 12.8 km 51
Carno wind farm 3 Announced Wind 15.0 km 45
Bryngydfa wind farm -- Announced Wind 16.8 km 36
Mynydd Clogau wind farm 1 Canceled Wind 17.8 km 16
Cemmaes 3 wind farm -- Canceled Wind 18.4 km 24
Esgair Cwmowen wind farm -- Announced Wind 23.4 km 47.5

Sources GEM · NESO

Supported by National Energy SO Open Data

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • NESOOpen license, with credit · retrieved Nov 18, 2026Supported by National Energy SO Open Data

Attribution