Show on map
BTB ENERGY DECATUR IMBODEN DATA CENTER/SOLAR ARRAYBTB ENERGY DECATUR BRUSH COLLEGE DATA CENTER/SOLAR ARRAY — Under construction · Large load · IL · 5.5 mi awayArgenta Solar — Under construction · Solar · IL · 1.5 MW · 14.7 mi away
  • Wind & solar
  • Loads
  • Under construction
  • Size not stated
  • 10 · 100 · 1,000 MW

BTB Energy Decatur Imboden Data Center/Solar Array

Data center

As filed: BTB ENERGY DECATUR IMBODEN DATA CENTER/SOLAR ARRAY

Kind
Data center
Location
Macon County, Illinois

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Data center source: “Data Center”
Capacity (MW)
Not stated
Local approvals PremiumComing soon: moratoriums, zoning votes and hearings for a site's county and city. Join for early access.
  • Selected as a data center because the facility name says data center. EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)

Timeline

  • Observed as under construction in EPA ICIS-NPDES (source status: “EFF”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EPA ICIS-NPDES

Sources

Every source and license · Attribution

View at source

Local government activity · LocalGovIndex Meeting records by GovData Systems

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
BTB ENERGY DECATUR BRUSH COLLEGE DATA CENTER/SOLAR ARRAY Under construction Large load 5.5 mi
Argenta Solar Under construction Solar 14.7 mi 1.5

Sources EPA ICIS-NPDES · EIA-860M

Sources

Attribution