Carrington Power Station
Gas, combined cycle
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-000092
- Location
- Carrington GSP (SP Manweb), United Kingdom
Details
Who’s behind it
- Developer
- Carrington Power Limited
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Gas, combined cycle source: “CCGT (Combined Cycle Gas Turbine)”
- Connects at
- Carrington GSP (SP Manweb)Connection point0 MW active (0 of 2 projects).
Timeline
- Observed as built in NESO (source status: “Built”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources NESO
Supported by National Energy SO Open Data