Show on map

Exact site not public

Offshore wind

As filed: CENOS

Capacity
Capacity: sourceNESO · Open license, with creditMW
Queue position
PRO-001847
In-service date
(stated)
Location
Peterhead 400kV Substation, United Kingdom (exact site not stated)EstimateEstimated from a named place. The source names a nearby place, not the site. Source: NESO. How we estimate →

Sources

  • NESO ·

    NESO Transmission Entry Capacity (TEC) Register

    Open license, with credit · retrieved Nov 11, 2026

    National Energy SO Open Data Licence v1.0 (based on OGL v3), retrieved 2026-09-12 — free to "exploit the Information commercially and non-commercially"; must "Acknowledge NESO as the source of the Information by including the following attribution statement: Supported by National Energy SO Open Data"

    View at source →

    Supported by National Energy SO Open Data · license

  • GEM ·

    Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

    Open license, with credit · retrieved Oct 26, 2026

    Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license

    In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).

    View at source →
Units and requests (2)
Units and requests that make up this project
SourceRecordNameTechnologyMWStatusProposed COD
NESO Request a0l4L0000005iPEQAY CENOS Offshore wind 1,350 Filed “Scoping” Oct 31, 2035
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) Generator G100000925809 Cenos floating wind farm -- Offshore wind 1,350 Announced “pre-construction” —
Report a problem
What is wrong with CENOS?

Up to 2,000 characters. A link to a source helps an editor check it.

Only if you would like a reply. It is used for this report and nothing else; see the privacy notice.

Sources

Sources NESO

Supported by National Energy SO Open Data

Sources

  • NESOOpen license, with credit · retrieved Nov 11, 2026Supported by National Energy SO Open Data

Attribution

View at source