Show on map
Clairemont SolarWhite Camp Solar — Postponed · Solar · TX · 100 MW · 8.4 mi away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Clairemont Solar

Solar

Capacity
Capacity: sourceERCOT · Open licenseMW
In-service date
(stated)
Location
Kent County, Texas

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar - Photovoltaic Solar”
Capacity (MW)
251.8 Capacity is the interconnection request in ERCOT GIS Report (Generator Interconnection Status). The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 250 MW nameplate.
Connects at
59908 Novaprime 345kVConnection point511.1 MW active (2 of 2 projects).
EIA plant
68351 generator CLAPV

Timeline

  • Stated In-service date stated by ERCOT.
  • Observed as contracted in ERCOT (source status: “Completed”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
White Camp Solar Postponed Solar 8.4 mi 100

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution