Show on map

Exact site not public

Clutch City Solar Phase II

Solar

No longer listedNo longer listedNo longer listed in any register since .

Capacity
Capacity: sourceERCOT · Open licenseMW
In-service date
(stated)
Location
Brazoria County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar - Photovoltaic Solar”
Connects at
tap 138kV 42960 Mustang Bayou – 42100 Hudson CKT #04Connection point452 MW active (2 of 2 projects).

At this site

2 records at Clutch City Solar Phase IIAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Clutch City Solar Phase II this record Solar 251.3 Contracted
Another phase high confidence Clutch City Solar Phase I Solar 200.8 Contracted

Sources ERCOT

Sources

  • ERCOTTerms of use · retrieved Nov 2, 2026

Attribution

Timeline

  • Stated In-service date stated by ERCOT.
  • No longer in ERCOT's report (reason not stated).
  • Observed as contracted in ERCOT (source status: “Completed”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources ERCOT

Sources

  • ERCOTOpen license · retrieved Nov 2, 2026

Every source and license · Attribution

View at source

Report a problem