Show on map
CobaltSan Pedro Public Market (SPPM) — Under construction · Solar · CA · 1.2 MW · 12.5 mi awayElevate Pier S — Filed · Storage · CA · 70 MW · 13.6 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Solar + storage

Capacity
Capacity: sourceCAISO · Open license, with creditMW
In-service date
(stated)
Location
Riverside County, California

Details

Who’s behind it

Developer
RE Cobalt LLC

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Capacity (MW)
250 Capacity is the interconnection request in CAISO Public Queue Report. The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 250 MW nameplate.
Connects at
Colorado River Substation 220kVConnection point250 MW active (1 of 5 projects).
EIA plant
70178 generator CBLT

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as under construction in EIA-860M (source status: “(U) Under construction, less than or equal to 50 percent complete”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 13, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
San Pedro Public Market (SPPM) Under construction Solar 12.5 mi 1.2
Elevate Pier S Filed Storage 13.6 mi 70

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution