Show on map
- Wind & solar
- Storage
- In development
- Under construction
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- In development
- Under construction
Cobalt: the source's site coordinate and 2 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Cobalt
Solar + storage
Key facts
Solar + storage Under construction (source status: (U) Under construction, less than or equal to 50 percent complete) (what this status means)- Capacity
- Capacity: sourceCAISO · Open license, with creditMW
- Queue position
- 1757
- In-service date
- (stated)
- Location
- Riverside County, California
Details
Who’s behind it
- Developer
- RE Cobalt LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Capacity (MW)
- 250 Capacity is the interconnection request in CAISO Public Queue Report. The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 250 MW nameplate.
- Connects at
- Colorado River Substation 220kVConnection point250 MW active (1 of 5 projects).
- EIA plant
- 70178 generator CBLT
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as under construction in EIA-860M (source status: “(U) Under construction, less than or equal to 50 percent complete”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
2 sourcesAround this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| San Pedro Public Market (SPPM) Under construction | Solar | 12.5 mi | 1.2 |
| Elevate Pier S Filed | Storage | 13.6 mi | 70 |
Sources EIA-860M