Show on map
- Wind & solar
- In development
- Under construction
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- In development
- Under construction
Concho Pearl Solar and Storage: the source's site coordinate and 1 exact-grade project within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Concho Pearl Solar and Storage
Solar + storage
- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 25INR0174, 25INR0175
- In-service date
- (stated)
- Location
- Concho County, Texas
Details
Who’s behind it
- Developer
- Red River Clean Energy
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar + storage source: “Solar - Photovoltaic Solar + Other - Battery Energy Storage”
- Capacity (MW)
- 334.3 Capacity is the interconnection request in ERCOT GIS Report (Generator Interconnection Status). The 2 generators listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 334.3 MW nameplate.
- Connects at
- Tap 345kV 76009 Twin Buttes - 7077 Amos CreekConnection point456.7 MW active (2 of 2 projects).
- EIA plant
- 67956 2 generatorsEIA generatorsPlant 67956 CONBS, CONPV
Timeline
- Stated In-service date stated by ERCOT.
- Observed as contracted in ERCOT (source status: “Completed”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
2 sourcesAround this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Lucy Solar Under construction | Solar | 3.5 mi | 352.2 |