Country Acres Clean Power LLCMaxim Crane - 1574 – SMF Data Center — Filed · Large load · CA · 7.5 mi awayNTT GLOBAL DATA CENTERS — Built · Large load · CA · 7.9 mi awayPivot Energy PPA 29 LLC — Under construction · Solar + storage · CA · 2.3 MW · 8.2 mi awaySkylight Renewable Energy — Announced · Solar + storage · CA · 200 MW · 13.9 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Country Acres Clean Power LLC

Solar + storage

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Interconnection queue
Balancing Authority of Northern California (BANC)
In-service date
(stated)
Location
Placer County, California

Details

Who’s behind it

Developer
Clenera DevCo LLC · part of CleneraOwnership claimOwnership link recorded from the companies' own published statements; no date stated by the source.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Solar + storage source: “Solar Photovoltaic + Batteries”
Capacity (MW)
516 Capacity is the sum of the 2 generators listed under Sources.
EIA plant
68940 2 generatorsEIA generatorsPlant 68940 CABS, CAPV

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as under construction in EIA-860M (source status: “(U) Under construction, less than or equal to 50 percent complete”).
  • EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2026-12-01 → 2027-02-01.
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Maxim Crane - 1574 – SMF Data Center Filed Large load 7.5 mi
NTT GLOBAL DATA CENTERS Built Large load 7.9 mi
Pivot Energy PPA 29 LLC Under construction Solar + storage 8.2 mi 2.3
Skylight Renewable Energy Announced Solar + storage 13.9 mi 200

Sources FAA OE/AAA · EPA ICIS-Air · EIA-860M