Exact site not public
Map
Cowley Energy Storage in United Kingdom: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Cowley Energy Storage
Storage
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-002066
- In-service date
- (stated)
- Location
- Cowley 400kV Substation, United Kingdom (exact site not stated)EstimateEstimated from the connection substation. The source names the connection substation, not the site. Source: NESO. How we estimate →
Details
Who’s behind it
- Developer
- BW ESS Development UK Limited
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Storage source: “Energy Storage System”
- Connects at
- Cowley 400kV SubstationConnection point1,457 MW active (5 of 6 projects).
At this site
2 records at Cowley Energy StorageAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Cowley Energy Storage | Storage | 300 | Permitted |
| Same site, relation unclear low confidence | Cowley Energy Storage this record | Storage | 200 | Permitted |
Also at this interconnection point (4)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- Cowley Farm 2 Solar + storage, 700 MW, filed at Cowley 400kV Substation
- Cowley Farm Solar + storage, 200 MW, filed at Cowley 400kV Substation
- Cowley (Tertiary) Solar + storage, 57 MW, filed at Cowley 400kV Substation
- Cowley Storage, 49.9 MW, built at Cowley 400kV Substation
Sources NESO
Supported by National Energy SO Open Data
Timeline
- Stated In-service date stated by NESO.
- Observed as permitted in NESO (source status: “Consents Approved”).
- First published from NESO Transmission Entry Capacity (TEC) Register.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources NESO
Supported by National Energy SO Open Data