CPUS West FRYE Road, LP
- Loads
- In development
- Under construction
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Loads
- In development
- Under construction
- Operating
- Size not stated
CPUS WEST FRYE ROAD, LP : the source's site coordinate and 17 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
CPUS West FRYE Road, LP
Data center
As filed: CPUS WEST FRYE ROAD, LP
- Kind
- Data center
- Location
- Maricopa County, Arizona
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Data center source: “Data Center”
- Capacity (MW)
- Not stated
Local approvals PremiumComing soon: moratoriums, zoning votes and hearings for a site's county and city. Join for early access.
- Selected as a data center because its industry code is NAICS 518210 (data processing and hosting). Some sites with this code are offices with a server room: 39 of 49 checked by hand were data centers. EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
Timeline
- Observed as built in EPA ICIS-Air (source status: “Operating”).
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources EPA ICIS-Air
Local government activity · LocalGovIndex Meeting records by GovData Systems
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| CYRUSONE - CHANDLER Built | Large load | 1.7 mi | |
| DIGITAL REALTY TRUST CHANDLER Built | Large load | 1.7 mi | |
| ALIGNED PHX-04 DATA CENTER Under construction | Large load | 2.0 mi | |
| PHX06 Data Center Filed | Large load | 2.2 mi | |
| Thistle Data Center Crane Filed | Large load | 5.3 mi | |
| MICROSOFT PHX 16 DATA CENTER Under construction | Large load | 9.7 mi | |
| AMERICAN AIRLINES - PHX DATA CENTER BLDG 1920 Under construction | Large load | 9.8 mi | |
| Iron Mountain Data Center Under construction | Large load | 11.9 mi | |
| PHOENIX DATA CENTER Built | Large load | 12.0 mi | |
| Stack Data Center Filed | Large load | 12.6 mi | |
| RED HAWK PH 3 (Mesa data centre) Filed | Large load | 12.6 mi | |
| MCDOWELL ROAD DATA CENTER Built | Large load | 12.9 mi | |
| QTS 40th Street Filed | Large load | 12.9 mi | |
| NTT PH 5 Filed | Large load | 13.4 mi | |
| Edgeconnex Filed | Large load | 14.0 mi | |
| Edged Data Center Filed | Large load | 14.1 mi | |
| NDA MESA DATA CENTER Built | Large load | 14.1 mi |