Derrygreenagh power plant CC1Derrygreenagh power plant GT1 — Announced · Gas, combustion turbine · 140 MW · 0.0 km awayGarr solar farm -- — Announced · Solar · 85 MW · 4.3 km awayRhode solar farm -- — Announced · Solar · 20 MW · 4.7 km awayClonfad solar farm -- — Under construction · Solar · 175 MW · 8.1 km awayMarlinstown solar project -- — Announced · Solar · 4 MW · 14.6 km awayBallyteige solar farm 1 — Announced · Solar · 115 MW · 14.9 km awayBallyteige solar farm 2 — Announced · Solar · 90 MW · 14.9 km awayKilcush solar farm -- — Announced · Solar · 50 MW · 16.1 km awaySlanemore PV solar project -- — Announced · Solar · 16.9 MW · 20.2 km awayMuiniagh solar project I -- — Announced · Solar · 4 MW · 20.5 km awayMuiniagh solar project II -- — Announced · Solar · 1.8 MW · 20.5 km awayDrehid wind farm -- — Announced · Wind · 45 MW · 24.3 km away
  • Combustion
  • Wind & solar
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Derrygreenagh power plant CC1

Gas, combined cycle

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Leinster, Ireland

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Gas, combined cycle source: “oil/gas / combined cycle”

At this site

2 records at Derrygreenagh power plant CC1At this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Derrygreenagh power plant CC1 this record Gas, combined cycle 570 Announced
Same site, relation unclear low confidence Derrygreenagh power plant GT1 Gas, combustion turbine 140 Announced

Sources GEM

Sources

  • GEMTerms of use · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution

Timeline

  • Observed as announced in GEM (source status: “pre-construction”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Derrygreenagh power plant GT1 Announced Gas, combustion turbine 0.0 km 140
Garr solar farm -- Announced Solar 4.3 km 85
Rhode solar farm -- Announced Solar 4.7 km 20
Clonfad solar farm -- Under construction Solar 8.1 km 175
Marlinstown solar project -- Announced Solar 14.6 km 4
Ballyteige solar farm 1 Announced Solar 14.9 km 115
Ballyteige solar farm 2 Announced Solar 14.9 km 90
Kilcush solar farm -- Announced Solar 16.1 km 50
Slanemore PV solar project -- Announced Solar 20.2 km 16.9
Muiniagh solar project I -- Announced Solar 20.5 km 4
Muiniagh solar project II -- Announced Solar 20.5 km 1.8
Drehid wind farm -- Announced Wind 24.3 km 45

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution