Show on map
- Combustion
- Wind & solar
- In development
- Under construction
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- In development
- Under construction
Derrygreenagh power plant CC1: the source's site coordinate and 12 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Derrygreenagh power plant CC1
Gas, combined cycle
- Capacity
- Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
- Location
- Leinster, Ireland
Details
Who’s behind it
- Developer
- Bord na Móna PLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Gas, combined cycle source: “oil/gas / combined cycle”
At this site
2 records at Derrygreenagh power plant CC1At this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Derrygreenagh power plant CC1 this record | Gas, combined cycle | 570 | Announced |
| Same site, relation unclear low confidence | Derrygreenagh power plant GT1 | Gas, combustion turbine | 140 | Announced |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Timeline
- Observed as announced in GEM (source status: “pre-construction”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Derrygreenagh power plant GT1 Announced | Gas, combustion turbine | 0.0 km | 140 |
| Garr solar farm -- Announced | Solar | 4.3 km | 85 |
| Rhode solar farm -- Announced | Solar | 4.7 km | 20 |
| Clonfad solar farm -- Under construction | Solar | 8.1 km | 175 |
| Marlinstown solar project -- Announced | Solar | 14.6 km | 4 |
| Ballyteige solar farm 1 Announced | Solar | 14.9 km | 115 |
| Ballyteige solar farm 2 Announced | Solar | 14.9 km | 90 |
| Kilcush solar farm -- Announced | Solar | 16.1 km | 50 |
| Slanemore PV solar project -- Announced | Solar | 20.2 km | 16.9 |
| Muiniagh solar project I -- Announced | Solar | 20.5 km | 4 |
| Muiniagh solar project II -- Announced | Solar | 20.5 km | 1.8 |
| Drehid wind farm -- Announced | Wind | 24.3 km | 45 |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.