Show on map
Exact site not public
Map
DMF Sagerton Solar SLF in Texas: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
DMF Sagerton Solar SLF
Solar
- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 26INR0146, 26INR0148
- In-service date
- (stated)
- Location
- Haskell County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →
Details
Who’s behind it
- Developer
- Double Mountain Fork LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “Solar - Photovoltaic Solar”
- Connects at
- Tap 138kV 6158 Aspermont – 6161 Paint CreekConnection point125.5 MW active (1 of 1 projects).
Timeline
- Stated In-service date stated by ERCOT.
- Observed as studied in ERCOT (source status: “Active”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
1 sourceSources ERCOT