Drakelow Power Station 2 BESS
Storage
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-004243
- In-service date
- (stated)
- Location
- DERBYSHIRE CONNECTION NODE E 132 KV SUBSTATION, United Kingdom
Details
Who’s behind it
- Developer
- Bluestone Energy Ltd
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Storage source: “Energy Storage System”
- Connects at
- DERBYSHIRE CONNECTION NODE E 132 KV SUBSTATIONConnection point720 MW active (3 of 3 projects).
At this site
3 records at Drakelow Power Station 1 BESSAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Drakelow Power Station 1 BESS | Storage | 240 | Filed |
| Another phase high confidence | Drakelow Power Station 2 BESS this record | Storage | 240 | Filed |
| Another phase high confidence | Drakelow Power Station 4 | Storage | 240 | Filed |
Sources NESO
Supported by National Energy SO Open Data
Timeline
- Stated In-service date stated by NESO.
- Observed as filed in NESO (source status: “Scoping”).
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources NESO
Supported by National Energy SO Open Data