Duffy BESSEldora Energy LLC — Contracted · Solar + storage · TX · 402.2 MW · 2.3 mi awayIsaac Solar — Under construction · Solar · TX · 50.7 MW · 9.8 mi awayBlackcat BESS — Studied · Storage · TX · 200.6 MW · 10.0 mi awayMatagorda Clean Energy Center (BESS) — Under construction · Storage · TX · 10.1 MW · 10.0 mi awayVentures BESS — Studied · Storage · TX · 238 MW · 10.0 mi awayCity Breeze Energy Storage — Under construction · Storage · TX · 143.1 MW · 12.9 mi awayDanish Fields Solar, LLC — Built · Solar · TX · 602.8 MW · 13.7 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Storage

Capacity
Capacity: sourceEIA-860M · Open licenseMW
In-service date
(stated)
Location
Matagorda County, Texas

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Storage source: “Other - Battery Energy Storage”
Capacity (MW)
241.1 Capacity is the interconnection request in ERCOT GIS Report (Generator Interconnection Status). The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 235.9 MW nameplate.
Connects at
Tap 345kV WAP to STP CKT39 (PTI# 5915-44000 CKT 39)Connection point743.5 MW active (2 of 2 projects).
EIA plant
69295 generator DFBSS

At this site

2 records at Duffy SolarAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Duffy Solar Solar 502.5 Contracted
Co-located, other technology high confidence Duffy BESS this record Storage 241.1 Under construction

Sources ERCOT · EIA-860M

Sources

  • ERCOTTerms of use · retrieved Nov 4, 2026
  • EIA-860MTerms of use · retrieved Nov 4, 2026

Attribution

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as under construction in EIA-860M (source status: “(V) Under construction, more than 50 percent complete”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Eldora Energy LLC Contracted Solar + storage 2.3 mi 402.2
Isaac Solar Under construction Solar 9.8 mi 50.7
Blackcat BESS Studied Storage 10.0 mi 200.6
Matagorda Clean Energy Center (BESS) Under construction Storage 10.0 mi 10.1
Ventures BESS Studied Storage 10.0 mi 238
City Breeze Energy Storage Under construction Storage 12.9 mi 143.1
Danish Fields Solar, LLC Built Solar 13.7 mi 602.8

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026