Exact site not public
Map
East Claydon Green Energy Centre in United Kingdom: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
East Claydon Green Energy Centre
Solar + storage
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-002383
- In-service date
- (stated)
- Location
- East Claydon 400kV Substation, United Kingdom (exact site not stated)EstimateEstimated from the connection substation. The source names the connection substation, not the site. Source: NESO. How we estimate →
Details
Who’s behind it
- Developer
- East Claydon Green NG Limited
Interested in this project?
- Kind
- Generation
- Technology
- Solar + storage source: “Demand;Energy Storage System;PV Array (Photo Voltaic/solar)”
- Connects at
- East Claydon 400kV SubstationConnection point6,175 MW active (7 of 7 projects).
At this site
2 records at East Claydon Green Energy CentreAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | East Claydon Green Energy Centre | Solar + storage | 2,050 | Studied |
| Same site, relation unclear low confidence | East Claydon Green Energy Centre this record | Solar + storage | 1,025 | Studied |
Also at this interconnection point (5)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- East Claydon High Impact Green Energy Hub (HIGEH) 1 Solar + storage, 1,000 MW, filed at East Claydon 400kV Substation
- East Claydon Greener Grid Park Storage, 650 MW, filed at East Claydon 400kV Substation
- East Claydon Storage Storage, 500 MW, filed at East Claydon 400kV Substation
- Rosefield Solar + storage, 500 MW, studied at East Claydon 400kV Substation
- Alderton PV & BESS Station Solar + storage, 450 MW, filed at East Claydon 400kV Substation
Sources NESO
Supported by National Energy SO Open Data
Timeline
- Stated In-service date stated by NESO.
- Observed as studied in NESO (source status: “Awaiting Consents”).
- First published from NESO Transmission Entry Capacity (TEC) Register.
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources NESO
Supported by National Energy SO Open Data