Exact site not public
Map
East Claydon Storage in United Kingdom: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
East Claydon Storage
Storage
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-001573
- In-service date
- (stated)
- Location
- East Claydon 400kV Substation, United Kingdom (exact site not stated)EstimateEstimated from the connection substation. The source names the connection substation, not the site. Source: NESO. How we estimate →
Details
Who’s behind it
- Developer
- East Claydon Storage Limited
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Storage source: “Energy Storage System”
- Connects at
- East Claydon 400kV SubstationConnection point6,175 MW active (7 of 7 projects).
At this site
2 records at East Claydon High Impact Green Energy Hub (HIGEH) 1At this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | East Claydon High Impact Green Energy Hub (HIGEH) 1 | Solar + storage | 1,000 | Filed |
| Same site, relation unclear low confidence | East Claydon Storage this record | Storage | 500 | Filed |
Also at this interconnection point (5)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- East Claydon Green Energy Centre Solar + storage, 2,050 MW, studied at East Claydon 400kV Substation
- East Claydon Green Energy Centre Solar + storage, 1,025 MW, studied at East Claydon 400kV Substation
- East Claydon Greener Grid Park Storage, 650 MW, filed at East Claydon 400kV Substation
- Rosefield Solar + storage, 500 MW, studied at East Claydon 400kV Substation
- Alderton PV & BESS Station Solar + storage, 450 MW, filed at East Claydon 400kV Substation
Sources NESO
Supported by National Energy SO Open Data
Timeline
- Observed as filed in NESO (source status: “Scoping”).
- Stated In-service date stated by NESO.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources NESO
Supported by National Energy SO Open Data