Ejin Horo cogen power station Unit 1Ejin Horo cogen power station Unit 4 — Under construction · Coal · 100 MW · 0.0 km awayKangbashi power station Phase II Unit 3 — Canceled · Coal · 350 MW · 18.6 km awayKangbashi power station Phase II Unit 4 — Canceled · Coal · 350 MW · 18.6 km away
  • Combustion
  • Under construction
  • 10 · 100 · 1,000 MW

Ejin Horo cogen power station Unit 1

Coal

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Inner Mongolia, China

Details

Who’s behind it

Developer
Yijinhuoluo Qi Jiutai Thermal Power Co Ltd · part of Yijinhuoluo Huizhong Service Group Co LtdOwnership claimOwnership link recorded from its source; no date stated by the source.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Coal source: “coal / unknown”

At this site

2 records at Ejin Horo cogen power station Unit 1At this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Ejin Horo cogen power station Unit 1 this record Coal 100 Under construction
Another phase high confidence Ejin Horo cogen power station Unit 4 Coal 100 Under construction

Sources GEM

Sources

  • GEMTerms of use · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution

Timeline

  • Observed as under construction in GEM (source status: “construction”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Ejin Horo cogen power station Unit 4 Under construction Coal 0.0 km 100
Kangbashi power station Phase II Unit 3 Canceled Coal 18.6 km 350
Kangbashi power station Phase II Unit 4 Canceled Coal 18.6 km 350

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution