EPL Suffolk
Solar + storage
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-003916
- In-service date
- (stated)
- Location
- North Anglia Connection Node E 400kV Substation, United Kingdom
Details
Who’s behind it
- Developer
- EPL NEWCO9 Limited
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar + storage source: “Energy Storage System;PV Array (Photo Voltaic/solar)”
- Connects at
- North Anglia Connection Node E 400kV SubstationConnection point2,390 MW active (7 of 7 projects).
Timeline
- Stated In-service date stated by NESO.
- Observed as filed in NESO (source status: “Scoping”).
- NESO Transmission Entry Capacity (TEC) Register: Proposed cod 2032-10-31 → 2034-10-31.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources NESO
Supported by National Energy SO Open Data