Show on map
ErinGulfStar Power, LLC — Under construction · Solar · TX · 451.6 MW · 5.4 km awayOCI SunRoper — Contracted · Solar · TX · 265.1 MW · 8.6 km awayPledger — Under construction · Storage · TX · 9.5 MW · 10.2 km awayWittig Solar Park — Permitted · Solar · TX · 106.9 MW · 16.2 km awayCity Breeze Energy Storage — Under construction · Storage · TX · 143.1 MW · 17.4 km awayBlackcat BESS — Studied · Storage · TX · 200.6 MW · 21.0 km awayVentures BESS — Studied · Storage · TX · 238 MW · 21.0 km awayMatagorda Clean Energy Center (BESS) — Under construction · Storage · TX · 10.1 MW · 21.6 km away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
In-service date
(stated)
Location
Wharton County, Texas

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar - Photovoltaic Solar”
Capacity (MW)
208.3 Capacity is the interconnection request in ERCOT GIS Report (Generator Interconnection Status). The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 202 MW nameplate.
Connects at
44040 Bailey 345 kVConnection point759.6 MW active (3 of 4 projects).
EIA plant
68275 generator 1

Timeline

  • Stated In-service date stated by ERCOT.
  • Observed as contracted in ERCOT (source status: “Completed”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
GulfStar Power, LLC Under construction Solar 5.4 km 451.6
OCI SunRoper Contracted Solar 8.6 km 265.1
Pledger Under construction Storage 10.2 km 9.5
Wittig Solar Park Permitted Solar 16.2 km 106.9
City Breeze Energy Storage Under construction Storage 17.4 km 143.1
Blackcat BESS Studied Storage 21.0 km 200.6
Ventures BESS Studied Storage 21.0 km 238
Matagorda Clean Energy Center (BESS) Under construction Storage 21.6 km 10.1