Show on map
- Wind & solar
- Storage
- In development
- Under construction
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- In development
- Under construction
Erin: the source's site coordinate and 8 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Erin
Solar
- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Queue position
- 23INR0058
- In-service date
- (stated)
- Location
- Wharton County, Texas
Details
Who’s behind it
- Developer
- Erin Solar LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “Solar - Photovoltaic Solar”
- Capacity (MW)
- 208.3 Capacity is the interconnection request in ERCOT GIS Report (Generator Interconnection Status). The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 202 MW nameplate.
- Connects at
- 44040 Bailey 345 kVConnection point759.6 MW active (3 of 4 projects).
- EIA plant
- 68275 generator 1
Timeline
- Stated In-service date stated by ERCOT.
- Observed as contracted in ERCOT (source status: “Completed”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
2 sourcesAround this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| GulfStar Power, LLC Under construction | Solar | 5.4 km | 451.6 |
| OCI SunRoper Contracted | Solar | 8.6 km | 265.1 |
| Pledger Under construction | Storage | 10.2 km | 9.5 |
| Wittig Solar Park Permitted | Solar | 16.2 km | 106.9 |
| City Breeze Energy Storage Under construction | Storage | 17.4 km | 143.1 |
| Blackcat BESS Studied | Storage | 21.0 km | 200.6 |
| Ventures BESS Studied | Storage | 21.0 km | 238 |
| Matagorda Clean Energy Center (BESS) Under construction | Storage | 21.6 km | 10.1 |