Show on map

Exact site not public

Fleet Tertiary

Other

Capacity
Capacity: sourceNESO · Open license, with creditMW
Queue position
PRO-000429
In-service date
(stated)
Location
Fleet 400kV Substation, United Kingdom (exact site not stated)EstimateEstimated from the connection substation. The source names the connection substation, not the site. Source: NESO. How we estimate →

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Other source: “Thermal”
Connects at
Fleet 400kV SubstationConnection point199.5 MW active (4 of 4 projects).

At this site

2 records at Fleet Solar PVAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Fleet Solar PV Solar 57 Studied
Same site, relation unclear low confidence Fleet Tertiary this record Other 47.5 Filed
Also at this interconnection point (2)

Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.

Sources NESO · GEM

Supported by National Energy SO Open Data

Sources

  • NESOTerms of use · retrieved Nov 11, 2026Supported by National Energy SO Open Data
  • GEMTerms of use · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution

Timeline

  • Stated In-service date stated by NESO.
  • Observed as filed in NESO (source status: “Scoping”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources NESO

Supported by National Energy SO Open Data

Sources

  • NESOOpen license, with credit · retrieved Nov 11, 2026Supported by National Energy SO Open Data

Every source and license · Attribution

View at source

Report a problem