Show on map
- Combustion
- Wind & solar
- In development
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- In development
- Operating
Floplast Castle Road solar project --: the source's site coordinate and 8 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Floplast Castle Road solar project --
Solar
- Capacity
- Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
- Location
- England, United Kingdom
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “utility-scale solar / PV”
Timeline
- Observed as announced in GEM (source status: “pre-construction”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Wienerberger Castle Road solar project -- Announced | Solar | 0.4 km | 1.1 |
| New Rides Farm Photovoltaic Panels solar farm -- Announced | Solar | 8.9 km | 10 |
| Medway Power Station Built | Gas, combined cycle | 11.0 km | 910 |
| Phinia Courteney Road solar project -- Announced | Solar | 12.5 km | 1.8 |
| Damhead Creek Built | Gas, combined cycle | 13.8 km | 812 |
| Oaklands Farm solar farm 2 Announced | Solar | 21.5 km | 11.4 |
| Herne Bay solar farm -- Unknown | Solar | 22.8 km | 20 |
| Premier Grocery Products Kennington Road solar project -- Announced | Solar | 23.8 km | 2.1 |
Supported by National Energy SO Open Data
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- NESOSupported by National Energy SO Open Data