Show on map
G4 Erzin-2 solar farm --Selena power station Unit 1 — Canceled · Coal · 450 MW · 7.7 km awaySelena power station Unit 2 — Canceled · Coal · 450 MW · 7.7 km awayÇalışkan Ceyhan power station Unit 2 — Canceled · Coal · 660 MW · 10.6 km awayÇalışkan Ceyhan power station Unit 1 — Canceled · Coal · 660 MW · 10.6 km awayAstoria Ceyhan power station Unit 1 — Canceled · Coal · 660 MW · 14.7 km awayAstoria Ceyhan power station Unit 2 — Canceled · Coal · 660 MW · 14.7 km awayDepolamali Deri̇n solar farm -- — Announced · Solar · 55 MW · 16.5 km awayÇelikler Yumurtalık power station Unit 1 — Canceled · Coal · 660 MW · 21.0 km awayÇelikler Yumurtalık power station Unit 2 — Canceled · Coal · 660 MW · 21.0 km awayGölovası power station -- — Canceled · Coal · 660 MW · 22.7 km away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

G4 Erzin-2 solar farm --

Solar

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Hatay Province, Türkiye

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “utility-scale solar / PV”

Timeline

  • Observed as announced in GEM (source status: “pre-construction”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Selena power station Unit 1 Canceled Coal 7.7 km 450
Selena power station Unit 2 Canceled Coal 7.7 km 450
Çalışkan Ceyhan power station Unit 2 Canceled Coal 10.6 km 660
Çalışkan Ceyhan power station Unit 1 Canceled Coal 10.6 km 660
Astoria Ceyhan power station Unit 1 Canceled Coal 14.7 km 660
Astoria Ceyhan power station Unit 2 Canceled Coal 14.7 km 660
Depolamali Deri̇n solar farm -- Announced Solar 16.5 km 55
Çelikler Yumurtalık power station Unit 1 Canceled Coal 21.0 km 660
Çelikler Yumurtalık power station Unit 2 Canceled Coal 21.0 km 660
Gölovası power station -- Canceled Coal 22.7 km 660

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution