Gallant Venture power station Phase II Unit 2
Coal
- Capacity
- Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
- Location
- Sumatera, Indonesia
Details
Who’s behind it
- Developer
- Gallant Venture Ltd
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Coal source: “coal / supercritical”
At this site
5 records at Gallant Venture power station Phase II Unit 1At this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Gallant Venture power station Phase II Unit 1 | Coal | 600 | Announced |
| Another phase high confidence | Gallant Venture power station Phase II Unit 2 this record | Coal | 600 | Announced |
| Another phase high confidence | Gallant Venture power station Phase I Unit 1 | Coal | 350 | Under construction |
| Same site, relation unclear low confidence | Gallant Venture power station Phase I Unit 2 | Coal | 350 | Under construction |
| Another phase high confidence | Gallant Venture power station Phase I Unit 3 | Coal | 350 | Under construction |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Timeline
- Observed as announced in GEM (source status: “pre-construction”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Gallant Venture power station Phase I Unit 1 Under construction | Coal | 0.0 km | 350 |
| Gallant Venture power station Phase I Unit 2 Under construction | Coal | 0.0 km | 350 |
| Gallant Venture power station Phase I Unit 3 Under construction | Coal | 0.0 km | 350 |
| Gallant Venture power station Phase II Unit 1 Announced | Coal | 0.0 km | 600 |
| Tanjung Sauh power station Unit 1 Under construction | Coal | 18.1 km | 150 |
| Tanjung Sauh power station Unit 2 Under construction | Coal | 18.1 km | 150 |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.