Garlogie PV and BESS A-1
Solar + storage
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-004636
- In-service date
- (stated)
- Location
- Garlogie Production A 275/33kV GSP, United Kingdom
Details
Who’s behind it
- Developer
- Garlogie Energy Centre Limited
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar + storage source: “Energy Storage System;PV Array (Photo Voltaic/solar)”
- Connects at
- Garlogie Production A 275/33kV GSPConnection point100 MW active (2 of 2 projects).
At this site
2 records at Garlogie PV and BESS A-2At this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Garlogie PV and BESS A-2 | Solar + storage | 50 | Filed |
| Another phase high confidence | Garlogie PV and BESS A-1 this record | Solar + storage | 50 | Filed |
Sources NESO
Supported by National Energy SO Open Data
Timeline
- Stated In-service date stated by NESO.
- Observed as filed in NESO (source status: “Scoping”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources NESO
Supported by National Energy SO Open Data