Show on map
- Wind & solar
- In development
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- In development
GS Lassance solar farm 4: the source's site coordinate and 63 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
GS Lassance solar farm 4
Solar
- Capacity
- Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
- Location
- Minas Gerais, Brazil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “utility-scale solar / PV”
Timeline
- Observed as announced in GEM (source status: “pre-construction”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| GS Lassance solar farm 3 Announced | Solar | 0.7 km | 40 |
| GS Lassance solar farm 5 Announced | Solar | 1.1 km | 40 |
| GS Lassance solar farm 2 Announced | Solar | 1.3 km | 40 |
| GS Lassance solar farm 6 Announced | Solar | 1.5 km | 40 |
| GS Lassance solar farm 1 Announced | Solar | 1.8 km | 40 |
| GS Lassance solar farm 7 Announced | Solar | 2.8 km | 33.3 |
| GS Lassance solar farm 8 Announced | Solar | 3.4 km | 33.3 |
| GS Lassance solar farm 9 Announced | Solar | 3.9 km | 40 |
| GS 1 solar farm 2 Announced | Solar | 4.6 km | 144 |
| GS 1 solar farm 3 Announced | Solar | 4.7 km | 144 |
| Xangrilá 2 solar farm 20 Announced | Solar | 5.0 km | 30 |
| Xangrilá 2 solar farm 18 Announced | Solar | 6.0 km | 30 |
| Xangrilá 2 solar farm 17 Announced | Solar | 6.0 km | 30 |
| GS 1 solar farm 1 Announced | Solar | 6.3 km | 162 |
| Xangrilá 2 solar farm 16 Announced | Solar | 6.3 km | 30 |
| Xangrilá 2 solar farm 19 Announced | Solar | 6.5 km | 30 |
| Xangrilá 2 solar farm 15 Announced | Solar | 6.5 km | 30 |
| Xangrilá 2 solar farm 14 Announced | Solar | 6.7 km | 30 |
| GS 1 solar farm 4 Announced | Solar | 6.7 km | 168 |
| Xangrilá 2 solar farm 13 Announced | Solar | 6.9 km | 30 |
| Xangrilá 2 solar farm 12 Announced | Solar | 7.2 km | 30 |
| Xangrilá 2 solar farm 11 Announced | Solar | 7.4 km | 30 |
| Xangrilá 2 solar farm 10 Announced | Solar | 7.5 km | 30 |
| Xangrilá 2 solar farm 9 Announced | Solar | 7.5 km | 30 |
| Xangri-Lá solar farm 2 Announced | Solar | 8.4 km | 45.2 |
| Xangrilá 2 solar farm 8 Announced | Solar | 8.6 km | 30 |
| Xangrilá 2 solar farm 7 Announced | Solar | 8.7 km | 30 |
| Xangrilá 2 solar farm 1 Announced | Solar | 8.9 km | 30 |
| Xangrilá 2 solar farm 2 Announced | Solar | 9.2 km | 30 |
| Xangri-Lá solar farm 3 Announced | Solar | 9.2 km | 30 |
| Vereda solar farm 12 Announced | Solar | 9.4 km | 30 |
| Xangrilá 2 solar farm 4 Announced | Solar | 9.7 km | 30 |
| Xangrilá 2 solar farm 3 Announced | Solar | 9.7 km | 30 |
| Xangrilá 2 solar farm 6 Announced | Solar | 9.9 km | 30 |
| Xangrilá 2 solar farm 5 Announced | Solar | 9.9 km | 30 |
| Vereda solar farm 13 Announced | Solar | 10.0 km | 30 |
| Xangri-Lá solar farm 1 Announced | Solar | 10.1 km | 30 |
| Vereda solar farm 11 Announced | Solar | 10.5 km | 30 |
| Vereda solar farm 10 Announced | Solar | 10.6 km | 30 |
| Vereda solar farm 14 Announced | Solar | 10.9 km | 30 |
| Vereda solar farm 15 Announced | Solar | 11.5 km | 20 |
| Vereda solar farm 16 Announced | Solar | 11.9 km | 20 |
| Várzea da Palma solar farm 1 Announced | Solar | 18.1 km | 48.1 |
| Várzea da Palma solar farm 2 Announced | Solar | 19.7 km | 48.1 |
| Várzea da Palma solar farm 3 Announced | Solar | 20.5 km | 48.1 |
| Jardim Veredas solar farm 9 Announced | Solar | 20.6 km | 50 |
| Solatio Várzea solar farm 2 Announced | Solar | 20.7 km | 45 |
| Jardim Veredas solar farm 6 Announced | Solar | 21.3 km | 20 |
| Jardim Veredas solar farm 5 Announced | Solar | 22.0 km | 50 |
| Jardim Veredas solar farm 8 Announced | Solar | 22.6 km | 50 |
| Jardim Veredas solar farm 4 Announced | Solar | 22.6 km | 50 |
| Walter Froes solar farm 6 Announced | Solar | 23.1 km | 35 |
| Solatio Várzea solar farm 1 Announced | Solar | 23.1 km | 45 |
| Alto São Francisco solar farm 4 Canceled | Solar | 23.2 km | 50 |
| Jardim Veredas solar farm 10 Announced | Solar | 23.3 km | 50 |
| Jardim Veredas solar farm 3 Announced | Solar | 23.5 km | 50 |
| Walter Froes solar farm 7 Announced | Solar | 23.7 km | 32.5 |
| Jardim Veredas solar farm 2 Announced | Solar | 23.8 km | 50 |
| Alto São Francisco solar farm 5 Canceled | Solar | 24.0 km | 50 |
| Walter Froes solar farm 8 Announced | Solar | 24.3 km | 32.5 |
| Alto São Francisco solar farm 7 Canceled | Solar | 24.5 km | 50 |
| Jardim Veredas solar farm 1 Announced | Solar | 24.6 km | 50 |
| Alto São Francisco solar farm 8 Canceled | Solar | 24.7 km | 50 |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.