H&C Wilbarger Power II
Gas, combined cycle
As filed: H&C WILBARGER POWER II
- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 32INR0008
- In-service date
- (stated)
- Location
- Wilbarger County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →
Details
Who’s behind it
- Developer
- H&C Wilbarger Power I
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Gas, combined cycle source: “Gas - Combined-Cycle”
- Connects at
- Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7BConnection point5,732.9 MW active (8 of 8 projects).
At this site
2 records at H&C WILBARGER POWER IAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | H&C WILBARGER POWER I | Gas, combined cycle | 1,025.5 | Studied |
| Another phase high confidence | H&C WILBARGER POWER II this record | Gas, combined cycle | 1,025.5 | Studied |
Also at this interconnection point (6)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- Limitless Energy Hub I Gas, combined cycle, 1,238.2 MW, contracted at Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B
- Limitless Energy Hub II Gas, combined cycle, 1,238.2 MW, contracted at Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B
- Big Field Solar Solar, 506.2 MW, studied at Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B
- Pease River Solar Solar, 276.4 MW, studied at Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B
- Grayback Solar Solar, 221.8 MW, studied at Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B
- Daisy Solar Solar, 200.9 MW, studied at Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B
Timeline
- Stated In-service date stated by ERCOT.
- Observed as studied in ERCOT (source status: “Active”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources ERCOT