Harker Green Energy Centre in United Kingdom: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Harker Green Energy Centre
Solar + storage
No longer listedNo longer listedNo longer listed in any register since .
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-001709-2, PRO-001709-1
- In-service date
- (stated)
- Location
- Harker 400kV Substation, United Kingdom (exact site not stated)EstimateEstimated from the connection substation. The source names the connection substation, not the site. Source: NESO. How we estimate →
Details
Who’s behind it
- Developer
- Blackdyke BESS Limited
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar + storage source: “Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore”
- Capacity (MW)
- 1,025 Capacity is the sum of the 2 interconnection requests listed under Sources.
- Connects at
- Harker 400kV SubstationConnection point2,913.9 MW active (8 of 8 projects).
At this site
2 records at Harker Green Energy CentreAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Harker Green Energy Centre this record | Solar + storage | 1,025 | Studied |
| Same site, relation unclear low confidence | Harker Green Energy Centre | Solar + storage | 400 | Studied |
Also at this interconnection point (6)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- Low Harker BESS Solar + storage, 400 MW, filed at Harker 400kV Substation
- ESB Harker BESS Storage, 342 MW, filed at Harker 400kV Substation
- Harker PV & BESS Sub Solar + storage, 249.9 MW, filed at Harker 400kV Substation
- NEL Story Storage, 240 MW, filed at Harker 400kV Substation
- BESS Harker Storage, 200 MW, permitted at Harker 400kV Substation
- Pivot Power Harker Hybrid Solar + storage, 57 MW, filed at Harker 400kV Substation
Sources NESO
Supported by National Energy SO Open Data
Timeline
- Stated In-service date stated by NESO.
- Observed as studied in NESO (source status: “Awaiting Consents”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
1 sourceSources NESO
Supported by National Energy SO Open Data