Hashknife Energy Center LLC
Solar + storage
Key facts
Solar + storage Under construction (source status: (V) Under construction, more than 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Interconnection queue
- Arizona Public Service (AZPS)
- In-service date
- (stated)
- Location
- Navajo County, Arizona
Details
Who’s behind it
- Developer
- Invenergy Services LLC · part of InvenergyOwnership claimOwnership link recorded from the companies' own published statements; no date stated by the source.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar + storage source: “Solar Photovoltaic + Batteries”
- Capacity (MW)
- 550 Capacity is the sum of the 2 generators listed under Sources.
- EIA plant
- 69778 2 generatorsEIA generatorsPlant 69778 HK1SO, HK1ST
At this site
2 records at Hashknife Energy Center LLCAt this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Hashknife Energy Center LLC this record | Solar + storage | 550 | Under construction |
| Another phase medium confidence | Hashknife Energy Center II LLC | Solar + storage | 400 | Under construction |
Sources EIA-860M
Timeline
- Observed as under construction in EIA-860M (source status: “(V) Under construction, more than 50 percent complete”).
- Stated In-service date stated by EIA-860M.
- EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2026-09-01 → 2026-11-01.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Hashknife Energy Center II LLC Under construction | Solar + storage | 0.0 mi | 400 |
Sources EIA-860M