Show on map
- Wind & solar
- In development
- Under construction
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- In development
- Under construction
Hecate Energy Cider Solar LLC: the source's site coordinate and 11 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Hecate Energy Cider Solar LLC
Solar
Key facts
Solar Under construction (source status: (U) Under construction, less than or equal to 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- In-service date
- (stated)
- Location
- Genesee County, New York
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “Solar Photovoltaic”
- EIA plant
- 64163 generator 11111
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as under construction in EIA-860M (source status: “(U) Under construction, less than or equal to 50 percent complete”).
- EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2026-10-01 → 2026-12-01.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| NY ELBA 7195 OAK ORCHARD RD - Genesee 1 Under construction | Solar | 3.2 mi | 5 |
| Heritage Wind Announced | Wind | 5.8 mi | 126 |
| Alabama Ledge Wind Farm LLC Postponed | Wind | 6.3 mi | 79.8 |
| Excelsior Energy Center Under construction | Solar | 8.1 mi | 280 |
| Leatherleaf Under construction | Solar | 10.4 mi | 5 |
| Holley Road Solar Postponed | Solar | 11.4 mi | 20 |
| SL Pembroke Under construction | Solar | 12.4 mi | 4 |
| SL Pembroke 2 Under construction | Solar | 12.4 mi | 5 |
| AES Rt 5 Solar CSG Under construction | Solar | 13.8 mi | 5 |
| Pescara 1 Under construction | Solar | 14.3 mi | 4.9 |
| Pescara 2 Under construction | Solar | 14.5 mi | 4.9 |
Sources EIA-860M