Hecate Energy Ramsey Storage: the source's site coordinate and 5 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Hecate Energy Ramsey Storage
Storage
- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 21INR0505
- In-service date
- (stated)
- Location
- Wharton County, Texas
Details
Who’s behind it
- Developer
- Hecate Energy Ramsey Storage LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Storage source: “Other - Battery Energy Storage”
- Capacity (MW)
- 500 Capacity is the interconnection request in ERCOT GIS Report (Generator Interconnection Status). The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 500 MW nameplate.
- Connects at
- 44200 Hillje 345kVConnection point926.2 MW active (4 of 5 projects).
- EIA plant
- 66414 generator RMSY
Timeline
- Stated In-service date stated by ERCOT.
- Observed as contracted in ERCOT (source status: “Completed”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
2 sourcesAround this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Danish Fields Solar, LLC Built | Solar | 1.4 mi | 602.8 |
| Matagorda Clean Energy Center (BESS) Under construction | Storage | 7.1 mi | 10.1 |
| Flag City Solar Postponed | Solar | 8.5 mi | 167.3 |
| Lunis Creek Solar and BESS SLF Postponed | Solar + storage | 11.9 mi | 1,238.5 |
| Eldora Energy LLC Contracted | Solar + storage | 13.2 mi | 402.2 |