Show on map
Highland Solar NorthHighland Solar South — Under construction · Solar · FL · 74.9 MW · 1.5 mi away
  • Wind & solar
  • Under construction
  • 10 · 100 · 1,000 MW

Highland Solar North

overdue by 3.0 years (target Dec 1, 2023)

Solar

Capacity
Capacity: sourceLBNL "Queued Up" project-level interconnection queue data file (non-ISO regions) · Open license, with creditMW
Interconnection queue
Duke Energy Florida
In-service date
(stated)
Location
Highlands County, Florida

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar”
Capacity (MW)
149.8 Capacity is the interconnection request in LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions). The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 74.9 MW nameplate.
EIA plant
64345 generator 1112

Timeline

  • Observed as under construction in Berkeley Lab (source status: “active”).
  • Stated In-service date stated by Berkeley Lab. Passed 3.0 years ago; Berkeley Lab still says under construction.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Overdue: the stated date is more than 90 days past. Some sources stop updating dates once a project is built.

Sources

2 sources

Sources Berkeley Lab · EIA-860M

Sources

  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Highland Solar South Under construction Solar 1.5 mi 74.9

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Oct 19, 2026

Attribution