Show on map
- Wind & solar
- Under construction
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Under construction
Highland Solar North: the source's site coordinate and 1 exact-grade project within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Solar
- Capacity
- Capacity: sourceLBNL "Queued Up" project-level interconnection queue data file (non-ISO regions) · Open license, with creditMW
- Interconnection queue
- Duke Energy Florida
- Queue position
- 258, 259
- In-service date
- (stated)
- Location
- Highlands County, Florida
Details
Who’s behind it
- Developer
- Placid Solar II, LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “Solar”
- Capacity (MW)
- 149.8 Capacity is the interconnection request in LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions). The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 74.9 MW nameplate.
- EIA plant
- 64345 generator 1112
Timeline
- Observed as under construction in Berkeley Lab (source status: “active”).
- Stated In-service date stated by Berkeley Lab. Passed 3.0 years ago; Berkeley Lab still says under construction.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Overdue: the stated date is more than 90 days past. Some sources stop updating dates once a project is built.
Sources
2 sourcesSources Berkeley Lab · EIA-860M
Sources
- Berkeley LabLawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
- EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Highland Solar South Under construction | Solar | 1.5 mi | 74.9 |
Sources EIA-860M