Show on map
- Combustion
- In development
- 10 · 100 · 1,000 MW
Map
- Combustion
- In development
Himeji Daiichi power station Repowered unit 3: the source's site coordinate and 5 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Himeji Daiichi power station Repowered unit 3
Gas, combined cycle
- Capacity
- Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
- Location
- Hyogo, Japan
Details
Who’s behind it
- Developer
- Kansai Electric Power Co
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Gas, combined cycle source: “oil/gas / combined cycle”
At this site
4 records at Himeji Daiichi power station Repowered unit 2At this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Himeji Daiichi power station Repowered unit 2 | Gas, combined cycle | 650 | Announced |
| Another phase high confidence | Himeji Daiichi power station Repowered unit 1 | Gas, combined cycle | 650 | Announced |
| Another phase high confidence | Himeji Daiichi power station Repowered unit 3 this record | Gas, combined cycle | 650 | Announced |
| Earlier filing, superseded low confidence | Wakayama power station 1 | Gas, other | 3,700 | Canceled |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Timeline
- Observed as announced in GEM (source status: “announced”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Himeji Daiichi power station Repowered unit 1 Announced | Gas, combined cycle | 0.0 km | 650 |
| Himeji Daiichi power station Repowered unit 2 Announced | Gas, combined cycle | 0.0 km | 650 |
| Wakayama power station 1 Canceled | Gas, other | 0.1 km | 3,700 |
| Takasago power station New Unit 1 Canceled | Coal | 9.4 km | 600 |
| Takasago power station New Unit 2 Canceled | Coal | 9.4 km | 600 |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.