Show on map
Issa SolarPoplar Camp Wind Farm — Postponed · Wind · VA · 72 MW · 8.8 mi away

Solar + storage

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Location
Carroll County, Virginia

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar + storage source: “Solar Photovoltaic + Batteries”
Capacity (MW)
300 Capacity is the sum of the 2 generators listed under Sources.
EIA plant
68314 2 generatorsEIA generatorsPlant 68314 ISSA, ISSAP

Timeline

  • Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Poplar Camp Wind Farm Postponed Wind 8.8 mi 72

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution