Jianli Bailuo cogen power station Unit 2Jianli Bailuo cogen power station Unit 3 — Canceled · Coal · 80 MW · 0.0 km awayHunan Linxiang Industrial Park cogen power station Phase I Unit 3 — Canceled · Coal · 38 MW · 12.1 km awayHunan Linxiang Industrial Park cogen power station Phase I Unit 4 — Canceled · Coal · 38 MW · 12.1 km awayHunan Linxiang Industrial Park cogen power station Phase II Unit 5 — Canceled · Coal · 38 MW · 12.1 km awayHunan Linxiang Industrial Park cogen power station Phase II Unit 6 — Canceled · Coal · 38 MW · 12.1 km awayHuaneng Yueyang power station Phase IV Unit 7 — Announced · Coal · 1,000 MW · 22.2 km awayHuaneng Yueyang power station Phase IV Unit 8 — Announced · Coal · 1,000 MW · 22.2 km away
  • Combustion
  • In development
  • 10 · 100 · 1,000 MW

Jianli Bailuo cogen power station Unit 2

Coal

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Hubei, China

Details

Who’s behind it

Developer
Jianli Fenghui Public Resources Investment Management Co Ltd · part of Jianli City Development Investment Group Co LtdOwnership claimOwnership link recorded from its source; no date stated by the source.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Coal source: “coal / unknown”

At this site

2 records at Jianli Bailuo cogen power station Unit 2At this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Jianli Bailuo cogen power station Unit 2 this record Coal 80 Canceled
Another phase high confidence Jianli Bailuo cogen power station Unit 3 Coal 80 Canceled

Sources GEM

Sources

  • GEMTerms of use · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution

Timeline

  • Observed as canceled in GEM (source status: “cancelled”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution