Show on map
- Wind & solar
- Under construction
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Under construction
- Operating
Jones City 2 Solar: the source's site coordinate and 5 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Jones City 2 Solar
Solar + storage
Key facts
Solar + storage Under construction (source status: (U) Under construction, less than or equal to 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- In-service date
- (stated)
- Location
- Jones County, Texas
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Storage
- Technology
- Solar + storage source: “Batteries + Solar Photovoltaic”
- Capacity (MW)
- 385 Capacity is the sum of the 2 generators listed under Sources.
- EIA plant
- 66893 2 generatorsEIA generatorsPlant 66893 TXJC2, TXJS2
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as under construction in EIA-860M (source status: “(U) Under construction, less than or equal to 50 percent complete”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Jones City 1 Solar Under construction | Solar | 1.2 mi | 215 |
| Cotton Belle Solar Postponed | Solar | 2.6 mi | 80 |
| Anson 2 Solar Built | Solar | 4.4 mi | 200.9 |
| Tiger Solar Under construction | Solar | 6.5 mi | 250.9 |
| Swenson Solar Under construction | Solar | 13.3 mi | 600 |