Exact site not public
Map
JUNIPERUSSS in Texas: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Juniperusss
Solar
As filed: JUNIPERUSSS
- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 26INR0304
- In-service date
- (stated)
- Location
- Hopkins County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →
Details
Who’s behind it
- Developer
- Blue Stone Renewable XXI LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “Solar - Photovoltaic Solar”
- Connects at
- Tap 345kV Cash Switch (bus# 2464) - Sandy Ranch Switch (bus# 2621)Connection point351.3 MW active (3 of 3 projects).
At this site
2 records at JUNIPERUS BESSAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | JUNIPERUS BESS | Storage | 169.6 | Studied |
| Co-located, other technology high confidence | JUNIPERUSSS this record | Solar | 80.3 | Studied |
Also at this interconnection point (1)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- Lucky 7 Solar Farm LLC Solar, 101.3 MW, under construction at Tap 345kV Cash Switch (bus# 2464) - Sandy Ranch Switch (bus# 2621)
Timeline
- Stated In-service date stated by ERCOT.
- Observed as studied in ERCOT (source status: “Active”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources ERCOT