Show on map
Juramento wind farm 1Juramento wind farm 3 — Announced · Wind · 48.1 MW · 2.2 km awayJuramento wind farm 2 — Announced · Wind · 48.1 MW · 2.7 km awayJuramento wind farm 4 — Announced · Wind · 48.1 MW · 3.3 km awayGDE Energia solar farm 1 — Announced · Solar · 250 MW · 12.5 km awayBarreiro solar farm 7 — Announced · Solar · 36 MW · 14.2 km awayBarreiro solar farm 6 — Announced · Solar · 42 MW · 14.2 km awayJuramento wind farm 7 — Announced · Wind · 48.1 MW · 14.7 km awayBarreiro solar farm 11 — Announced · Solar · 42 MW · 15.4 km awayJuramento wind farm 5 — Announced · Wind · 48.1 MW · 15.5 km awayBarreiro solar farm 10 — Announced · Solar · 42 MW · 16.2 km awayBarreiro solar farm 5 — Announced · Solar · 42 MW · 16.3 km awayBarreiro solar farm 9 — Announced · Solar · 42 MW · 16.8 km awayBarreiro solar farm 12 — Announced · Solar · 42 MW · 17.6 km awayJuramento wind farm 8 — Announced · Wind · 48.1 MW · 18.4 km awayJuramento wind farm 6 — Announced · Wind · 48.1 MW · 18.6 km awayBarreiro solar farm 8 — Announced · Solar · 42 MW · 19.0 km awayBarreiro solar farm 14 — Announced · Solar · 42 MW · 20.2 km awayBarreiro solar farm 13 — Announced · Solar · 36 MW · 21.4 km awayBarreiro solar farm 15 — Announced · Solar · 42 MW · 21.8 km awayBarreiro solar farm 3 — Announced · Solar · 48 MW · 22.8 km awayBarreiro solar farm 22 — Announced · Solar · 42 MW · 22.9 km awayNovo Texas solar farm 1 — Announced · Solar · 30 MW · 24.0 km awayBarreiro solar farm 17 — Announced · Solar · 48 MW · 24.0 km awayNovo Texas solar farm 2 — Announced · Solar · 30 MW · 24.2 km away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Juramento wind farm 1

Wind

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Minas Gerais, Brazil

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Wind source: “wind / Onshore”

Timeline

  • Observed as announced in GEM (source status: “pre-construction”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Juramento wind farm 3 Announced Wind 2.2 km 48.1
Juramento wind farm 2 Announced Wind 2.7 km 48.1
Juramento wind farm 4 Announced Wind 3.3 km 48.1
GDE Energia solar farm 1 Announced Solar 12.5 km 250
Barreiro solar farm 7 Announced Solar 14.2 km 36
Barreiro solar farm 6 Announced Solar 14.2 km 42
Juramento wind farm 7 Announced Wind 14.7 km 48.1
Barreiro solar farm 11 Announced Solar 15.4 km 42
Juramento wind farm 5 Announced Wind 15.5 km 48.1
Barreiro solar farm 10 Announced Solar 16.2 km 42
Barreiro solar farm 5 Announced Solar 16.3 km 42
Barreiro solar farm 9 Announced Solar 16.8 km 42
Barreiro solar farm 12 Announced Solar 17.6 km 42
Juramento wind farm 8 Announced Wind 18.4 km 48.1
Juramento wind farm 6 Announced Wind 18.6 km 48.1
Barreiro solar farm 8 Announced Solar 19.0 km 42
Barreiro solar farm 14 Announced Solar 20.2 km 42
Barreiro solar farm 13 Announced Solar 21.4 km 36
Barreiro solar farm 15 Announced Solar 21.8 km 42
Barreiro solar farm 3 Announced Solar 22.8 km 48
Barreiro solar farm 22 Announced Solar 22.9 km 42
Novo Texas solar farm 1 Announced Solar 24.0 km 30
Barreiro solar farm 17 Announced Solar 24.0 km 48
Novo Texas solar farm 2 Announced Solar 24.2 km 30

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution