Exact site not public
Map
Keadby North Power Station in United Kingdom: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Keadby North Power Station
Gas, combined cycle
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-001980
- In-service date
- (stated)
- Location
- Keadby 400kV Substation, United Kingdom (exact site not stated)EstimateEstimated from the connection substation. The source names the connection substation, not the site. Source: NESO. How we estimate →
Details
Who’s behind it
- Developer
- Keadby Generation Limited
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Gas, combined cycle source: “CCGT (Combined Cycle Gas Turbine)”
- Connects at
- Keadby 400kV SubstationConnection point892 MW active (1 of 5 projects).
At this site
4 records at KeadbyAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Keadby | Gas, combined cycle | 910 | Built |
| Expansion high confidence | Keadby South Power Station | Gas, combined cycle | 910 | Built |
| Another phase medium confidence | Keadby II | Gas, combined cycle | 893 | Built |
| Expansion medium confidence | Keadby North Power Station this record | Gas, combined cycle | 892 | Studied |
Also at this interconnection point (1)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- Brigg Gas, combined cycle, 99 MW, built at Keadby 400kV Substation
Sources NESO
Supported by National Energy SO Open Data
Timeline
- Stated In-service date stated by NESO.
- Observed as studied in NESO (source status: “Awaiting Consents”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources NESO
Supported by National Energy SO Open Data