Killingholme
Gas, combustion turbine
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-000148
- Location
- Killingholme 400kV Substation, United Kingdom
Details
Who’s behind it
- Developer
- Uniper UK Limited · part of Uniper SEOwnership claimOwnership link recorded from its source; no date stated by the source.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Gas, combustion turbine source: “OCGT (Open Cycle Gas Turbine)”
- Connects at
- Killingholme 400kV SubstationConnection point1,040 MW active (2 of 3 projects).
At this site
2 records at KillingholmeAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Killingholme this record | Gas, combustion turbine | 619 | Built |
| Expansion medium confidence | North Killingholme Power Project | Gas, combined cycle | 540 | Permitted |
Also at this interconnection point (1)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- THE CLEAN FUTURE Solar + storage, 500 MW, filed at Killingholme 400kV Substation
Supported by National Energy SO Open Data
Sources
- NESOSupported by National Energy SO Open Data
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Timeline
- Observed as built in NESO (source status: “Built”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources NESO
Supported by National Energy SO Open Data