Kincardine Energy Storage Facility
Storage
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-001653
- In-service date
- (stated)
- Location
- Fife Grid Services Facility 275kV Substation, United Kingdom
Details
Who’s behind it
- Developer
- Kincardine Grid 1 Ltd
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Storage source: “Energy Storage System”
- Connects at
- Fife Grid Services Facility 275kV SubstationConnection point400 MW active (3 of 3 projects).
At this site
2 records at Kincardine Battery Storage FacilityAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Kincardine Battery Storage Facility | Storage | 200 | Permitted |
| Same site, relation unclear low confidence | Kincardine Energy Storage Facility this record | Storage | 200 | Permitted |
Also at this interconnection point (1)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- Fife Grid Services Grid equipment, 0 MW, filed at Fife Grid Services Facility 275kV Substation
Sources NESO
Supported by National Energy SO Open Data
Timeline
- Stated In-service date stated by NESO.
- Observed as permitted in NESO (source status: “Consents Approved”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources NESO
Supported by National Energy SO Open Data