Show on map
Knockkippen Energy ParkEnoch Hill 2 Wind Farm — Studied · Wind + storage · 10 MW · 3.0 km awayLittle Kilmain wind farm -- — Canceled · Wind · 2.2 MW · 3.4 km awayKnockcronal Wind Farm — Studied · Wind · 59.4 MW · 9.3 km awaySouth Kyle 2 Wind farm — Filed · Wind + storage · 92.4 MW · 11.5 km awayAilsa Hospital wind farm -- — Announced · Wind · 1 MW · 12.4 km awayCarrick Wind Farm — Studied · Wind · 84 MW · 13.3 km awayCraiginmoddie Wind Farm — Filed · Wind · 92.4 MW · 13.5 km awayPencloe Windfarm — Under construction · Wind + storage · 115 MW · 14.1 km awayEnoch Hill — Built · Wind + storage · 69 MW · 14.7 km awayAshmark Hill Community wind farm -- — Canceled · Wind · 21 MW · 16.3 km awayKnockshinnoch wind farm -- — Announced · Wind · 4 MW · 17.7 km awayHadyard Hill — Built · Wind · 99.9 MW · 19.3 km awayQuantans Hill Wind Farm — Filed · Wind · 95 MW · 19.9 km awayGarleffan wind farm -- — Wind · 21.6 MW · 20.7 km awayTorrs Hill wind farm -- — Under construction · Wind · 4 MW · 21.7 km awayKnockodhar Wind Farm — Filed · Wind · 120 MW · 21.7 km awayLongburn I wind farm -- — Wind · 23 MW · 22.5 km awayEuchanhead Wind Farm — Studied · Wind · 112 MW · 23.1 km awayThe Drum Wind Farm — Filed · Wind · 57.6 MW · 23.7 km awayShepherd'S Rig wind farm -- — Announced · Wind · 70.2 MW · 24.0 km awayClauchrie Windfarm — Filed · Wind + storage · 108 MW · 24.5 km away
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Knockkippen Energy Park

Solar + storage

Capacity
Capacity: sourceNESO · Open license, with creditMW
Queue position
PRO-001826
In-service date
(stated)
Location
Scotland, United Kingdom

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar + storage source: “Demand;Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore”
Capacity (MW)
60 Capacity is the interconnection request in NESO Transmission Entry Capacity (TEC) Register. The 1 generator listed in Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) (listed under Sources) total 60 MW nameplate.
Connects at
Ayr GSPConnection point60 MW active (1 of 1 projects).

Timeline

  • Stated In-service date stated by NESO.
  • Observed as filed in NESO (source status: “Scoping”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources NESO · GEM

Supported by National Energy SO Open Data

Sources

  • NESOOpen license, with credit · retrieved Nov 18, 2026Supported by National Energy SO Open Data
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Enoch Hill 2 Wind Farm Studied Wind + storage 3.0 km 10
Little Kilmain wind farm -- Canceled Wind 3.4 km 2.2
Knockcronal Wind Farm Studied Wind 9.3 km 59.4
South Kyle 2 Wind farm Filed Wind + storage 11.5 km 92.4
Ailsa Hospital wind farm -- Announced Wind 12.4 km 1
Carrick Wind Farm Studied Wind 13.3 km 84
Craiginmoddie Wind Farm Filed Wind 13.5 km 92.4
Pencloe Windfarm Under construction Wind + storage 14.1 km 115
Enoch Hill Built Wind + storage 14.7 km 69
Ashmark Hill Community wind farm -- Canceled Wind 16.3 km 21
Knockshinnoch wind farm -- Announced Wind 17.7 km 4
Hadyard Hill Built Wind 19.3 km 99.9
Quantans Hill Wind Farm Filed Wind 19.9 km 95
Garleffan wind farm -- Unknown Wind 20.7 km 21.6
Torrs Hill wind farm -- Under construction Wind 21.7 km 4
Knockodhar Wind Farm Filed Wind 21.7 km 120
Longburn I wind farm -- Unknown Wind 22.5 km 23
Euchanhead Wind Farm Studied Wind 23.1 km 112
The Drum Wind Farm Filed Wind 23.7 km 57.6
Shepherd'S Rig wind farm -- Announced Wind 24.0 km 70.2
Clauchrie Windfarm Filed Wind + storage 24.5 km 108

Sources NESO · GEM

Supported by National Energy SO Open Data

Sources

  • NESOOpen license, with credit · retrieved Nov 18, 2026Supported by National Energy SO Open Data
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution