Lairg II Wind Farm
Wind
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-001434
- In-service date
- (stated)
- Location
- Scotland, United Kingdom
Details
Who’s behind it
- Developer
- Lairg II LLP
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Wind source: “Wind Onshore”
- Capacity (MW)
- 50 Capacity is the interconnection request in NESO Transmission Entry Capacity (TEC) Register. The 1 generator listed in Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) (listed under Sources) total 49.9 MW nameplate.
- Connects at
- Lairg GSPConnection point134.7 MW active (3 of 3 projects).
Timeline
- Stated In-service date stated by NESO.
- Observed as permitted in NESO (source status: “Consents Approved”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
2 sourcesSupported by National Energy SO Open Data
Sources
- NESOSupported by National Energy SO Open Data
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Strath Tirry Studied | Wind | 11.1 km | 34.8 |
| Chleansaid Wind Farm Permitted | Wind | 13.1 km | 96 |
| Dalnessie wind farm -- Canceled | Wind | 13.5 km | 67.5 |
| Garvary Wind Farm Permitted | Wind | 13.6 km | 144 |
| Shinness wind farm -- Announced | Wind | 13.6 km | 105.6 |
| Strath Oykel Wind Farm Studied | Wind + storage | 16.8 km | 74 |
| Meall Buidhe Wind Farm Filed | Wind | 17.8 km | 40 |
| Glencassley wind farm -- Canceled | Wind | 19.4 km | 69 |
| Kenfig Industrial Estate, Margam wind farm 2 Canceled | Wind | 22.6 km | 4.6 |
| Shore Road Distillery and Visitor Centre solar project -- Announced | Solar | 23.4 km | 1 |
| Caplich wind farm -- Unknown | Wind | 24.3 km | 68 |
Supported by National Energy SO Open Data
Sources
- NESOSupported by National Energy SO Open Data
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.