Show on map
Leacht Cross solar project I --Leacht Cross solar project II -- — Announced · Solar · 5 MW · 0.2 km awayBallynacrusha solar project -- — Announced · Solar · 5 MW · 7.2 km awayAghada power station GT — Announced · Gas, combustion turbine · 299 MW · 8.6 km awayBarryscourt solar project -- — Announced · Solar · 8 MW · 10.9 km awayFarrangalway solar project -- — Announced · Solar · 5 MW · 15.5 km awayLysaghtstown solar farm 2 — Announced · Solar · 45 MW · 15.6 km awayBallynahina solar farm -- — Announced · Solar · 30 MW · 17.3 km awayCarrigogna solar project -- — Announced · Solar · 10 MW · 17.7 km awayTead More solar project -- — Announced · Solar · 4 MW · 18.2 km awayRahanisky solar farm -- — Announced · Solar · 39.9 MW · 18.2 km awayBallyduff PV solar project -- — Announced · Solar · 7 MW · 18.7 km away
  • Combustion
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Leacht Cross solar project I --

Solar

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Ireland

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “utility-scale solar / Assumed PV”

Timeline

  • Observed as announced in GEM (source status: “pre-construction”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Leacht Cross solar project II -- Announced Solar 0.2 km 5
Ballynacrusha solar project -- Announced Solar 7.2 km 5
Aghada power station GT Announced Gas, combustion turbine 8.6 km 299
Barryscourt solar project -- Announced Solar 10.9 km 8
Farrangalway solar project -- Announced Solar 15.5 km 5
Lysaghtstown solar farm 2 Announced Solar 15.6 km 45
Ballynahina solar farm -- Announced Solar 17.3 km 30
Carrigogna solar project -- Announced Solar 17.7 km 10
Tead More solar project -- Announced Solar 18.2 km 4
Rahanisky solar farm -- Announced Solar 18.2 km 39.9
Ballyduff PV solar project -- Announced Solar 18.7 km 7

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution